Dimpled Foundation Membrane Installation Instructions

Installing Dimpled Foundation Membrane on a Concrete Wall

Materials and tools may vary depending on your application for a Poured Concrete Wall.

SUPERSEAL DETAILED INSTRUCTIONS: Installation Instructions

EXTERIOR  APPLICATION:

The keys to a good installation:

  • Install to final grade height.
  • Incorporate into the drain system at the footing.
  • Install the membrane prior to installing perforated pipe and the drainstone.
  • Ensure you have enough membrane, plugs, and molding strips to complete the area that you are protecting.
  • We often recommend you order both types of molding. DimpleGrip Molding & Membrane Cap if your job has both level and sloping areas.
  • Follow the Installation instructions.
  • Addition coating(s) or a self-adhesive membrane on the wall is not required but provides additional protection. Consult with your local building official or inspector, as they determine what they will accept. This can vary from city to city.

 

PREPARATION

  • Ensure the site is safe and accessible.
  • Make sure that you have all the tools and material necessary to complete the job.
  • Determine the roll heights required and measure the length required.
  • Determine the final grade height and snap chalk lines. The product should not be exposed to UV for long periods of time.
  • Clean the footing and wall and repair any imperfections.
  • Use a suitable mastic or tar for patching joints, gaps, protrusions, imperfections, etc. This can be found in the roofing or foundation section at your local lumber yard or Hardware store. (It is recognized as foundation mastic, roof patch, and plastic cement). The most cost effective is tar based and black in color. It is available in 1 and 5 gallon pails. It is also available in tubes designed to fit a caulking gun. SUPERSEAL is chemical resistant and compatible with all these types of products.
  • As additional protection, it is recommended, but not mandatory to put a little mastic over each of the tie holes. (these are the spots where a metal strap goes all the way through the wall). A small putty knife works good for this, if the mastic is in a pail. The caulking gun tube also works well.

 

There are 3 steps to the installation – Do not try to do all three steps as you go. It is much easier and quicker to do it in 3 stages

  • Hanging / Plugging / Molding
  1. HANGING THE MEMBRANE

It is best to have two people and to install the membrane. Once you have your wall prepped, start by holding the membrane at the chalk line with the dimples towards the wall and install a SuperPlug about 8-12 inches down from the top. Move down the wall approx. 8 -10 feet and install another SuperPlug. Continue this process until all the membrane is hanging on the wall. If you have extra material at the bottom it is flexible enough to make a 90 degree bend where the wall meets the footing. The membrane can sit directly on top of the footing or extend out to the edge. If you are extending to the edge of the footing and come to an inside or outside corner, put a slice in the membrane at the bottom to allow the rest of the roll to wrap the corner without cutting the entire roll vertically. When hanging the membrane keep in mind that you don’t have to put all the plugs in now. You will do this on the next step.

OVERLAPS AND SEAMS

Vertical and horizontal overlaps are a minimum of 6 inches and a plug every 2’ vertically. It is good practice to run a bead of the mastic within the overlap but is not mandatory. Overlaps in sloping areas should be done by overlapping the higher piece over the lower piece. This will prevent migrating water to enter the seam. (just like a roof shingle).

ANGLES OR SLOPES

Angles can be done 2 ways:

1) by installing the membrane on the wall at the desired angle. If you do this, you can use the DimpleGrip Molding at the top, as you have not cut the top. The DimpleGrip fits the factory edges on the membrane.

2) by installing the membrane level on the wall and cutting the top to desired angle or slope. If you cut the top, you must use the Membrane Cap. The DimpleGrip won’t fit properly.

WINDOW WELLS

Windows are the # 1 cause of water penetration. Concrete cracks at the weakest point and that is almost always at the bottom of a window opening. If you have any windows that are lower than grade height and require a window well, cut and cap the membrane as close the bottom of the window as possible. Cut and cap the sides vertically so it will end up just inside the window well opening on each side. Vertical cuts should be made where there is a holding tab. (HINT: you can cap it later when you do the rest of the molding or cap)

After you have hung all the membrane, go back to where you started and start step 2 – plugging

  1. PLUGGING THE MEMBRANE
  • At the top is where you follow the specific pattern that repeats over and over. The basic pattern is;  install a row of plugs 8 – 10 inches down from the top, every 16 inches horizontally. Then 8 inches down for that row of plugs install another row of plugs every 16 inches that are between the plugs above. This creates a “W” pattern . (See detailed instructions for more details)
  • In the middle and the bottom, you put plugs every 6 -10 feet horizontally. Enough to keep the membrane tight against the wall.  Try to get the bottom plugs as close to the footing as possible to prevent the membrane from moving around while the drain work and backfilling is being done.
  • Plugs are installed every 2 feet vertically on all overlaps
  • Plugs are installed every 2 feet vertically and 4-6 inches in from inside and outside corners.
  • After all the plugs are in, go back to where you started and start step 3 – Molding/Capping.
  1. MOLDING or CAPPING

Molding must be installed on all open edges using the Membrane Cap or DimpleGrip Molding. (HINT: We often recommend to order both  DimpleGrip Molding & Membrane Cap if your job has both level and sloping areas)

DimpleGrip Molding is a piece of plastic 4 feet long and 3 ½ inches wide. It has reverse dimples on the back that interlock into the top 4 rows of dimples on the membrane itself. Giving a stronger hold which reduces the amount of plugs needed at the top. It has a soft lip on it that seals the top against the wall. It fits vertically and horizontally into the factory edges of the membrane. It costs a bit more but saves in time and labor. If you cut the membrane on an angle at the top, the dimples won’t fit properly, so you would use the Membrane Cap in that spot. You can use DimpleGrip for your entire job if your final grade is level. A good application is to use the DimpleGrip for horizontal edges and Membrane Cap for vertical edges, angles, and slopes.

Membrane Cap is a piece of plastic 4 feet long and only 1½ inches wide that seals all open edges. It is L shaped and smooth on the back. It can be installed horizontally, vertically, and on any angle. You can use the Membrane Cap throughout your entire job. However, you will use more SuperPlugs below the Membrane Cap than you would below the DimpleGrip. (see detailed instructions)

The DimpleGrip and the Membrane Cap are in a bundle with 10 pieces that are  4 feet long equaling 40 linear feet. Both are fastened every 6-8 inches butting each piece together as you go. Both can be cut with a standard utility knife. It is not necessary to overlap them.

Once the molding has been installed, it is good practice to walk around and patch any open spots. Feel free to put in addition plugs where desired, to keep it as flat as possible on the wall.

INSTALLING DRAIN SYSTEM

Install your drain system as per building code requirements. You must put a minimum of 6 inches of drain stone around the drainpipe, up on the footing, and up on the SUPERSEAL Membrane at the bottom. The bottom of the membrane should be incorporated in the drain system. This will allow any water that may enter the drainage space, to fall by gravity to the footing and migrate through the stone and into the pipe for removal.

 

FASTENING SYSTEMS

There are two molding systems to choose from. The DimpleGrip System and the Standard System

1)      The DimpleGrip System requires DimpleGrip Molding and SuperPlugs. (see below)

2)      The Standard System requires Membrane Cap and SuperPlugs. (see below)

DIMPLEGRIP FASTENING SYSTEM
(Premium system for ICF’s & Concrete Block)

Requires DimpleGrip Molding for horizontal and vertical edges. SuperPlugs fastened 12-16″ OC and Membrane Cap for sloping areas. Small Plugs can be used to fasten corners and overlaps.

1 roll of membrane requires approximately:

  • 2 bundles of DimpleGrip
  • Membrane Cap for slopes and angles – 40 feet per bundle
  • SuperPlugs: 2 bags for 3’6″ to 7’11” per roll or 3 bags for 8’11” to 9’11” per roll

STANDARD FASTENING SYSTEM
(Most economical material cost system)

Requires Membrane Cap for all edges and SuperPlug fastened 8″ OC. Small Plugs can be used to fasten corners and overlaps.

1 roll of membrane requires approximately:

  • 2 bundles of Membrane Caps
  • SuperPlugs: 3 bags for 3’6″ to 7’11” per roll or 4 bags for 8’11” to 9’11” per roll


SuperPlugs

Each plug has 5 dimples that interlock into the membrane providing superior holding strength over a single plug. Recommended for all areas.

Membrane Cap

Smooth L shaped molding that caps the membrane – 40 feet per bundle.


DimpleGrip Molding (Optional)

Interlocks with the top 4 rows of the membrane along its entire length. Provides superior strength and uses less Super Plugs and labour.

Small Plugs (Optional)

Fits into individual dimple. Used mostly for contractors with a nail gun system.

TOOL REQUIRED

CONCRETE NAIL GUN – For poured walls

Any nail gun that is designed for concrete will work. These can be purchased or rented at your local tool rental center. Use 11/4” – 11/2” nails.

The following guns work very well with the system as they hold 40 nails and the installation is quick. The nose piece friction fits the SuperPlug and Small Plug perfectly without any fancy adapters.

HILTI GX 120 https://www.hilti.ca/direct-fastening/electrical-%26-mechanical-fastenings/r3697

HILTI G3 https://www.hilti.ca/direct-fastening/drywall-applications/3538128

Ramset Trakfast http://www.ramset.ca/product/47/trakfast-gas-powered-tool

Some nail guns are powder activated and have different strengths of shots.

TAPCON – Poured and Block wall Foundations

You can also use 1¼ inches Tapcon screws (1¼ inches x 3/16 inches hexagon head is best). This is a predrill system. This is more time consuming than a nail gun but works well if it you are doing a small job or it’s a onetime use. TAPCON https://www.tapcon.com/products/concrete-screw-anchors

CONCRETE NAILS – Hand nailing

It is possible to use standard concrete nails and a hammer. Concrete varies in hardness in different regions. This method is labour intensive and time consuming. This is usually only done when the concrete is freshly poured and is in the curing process. Test a spot first before continuing.

You can predrill a small pilot hole slightly smaller than the shank size of the nail and then hammer it in.

Other tools you may need:

Eye protection, Ear protection, gloves, hammer, Tool belt, tape measure, marker, chalk line, utility knife, ladder, caulking gun or putty knife

 

 

 

Laminate & Carpet Installation Instructions

SUBFLOOR MEMBRANE INSTALLATION STEPS

  • Acclimatize the roll (12-24 hours)
  • Sweep up all loose debris.
  • Ensure your floor is flat prior to installation.
  • Fill any low spots with a leveling compound.
  • Cut to fit leaving it ¼ inch away from the wall
  • Flip the membrane over
  • Butt all seams together and tape
  • Install flooring

Material and tools required:

  • Appropriate amount of SUPERSEAL Subfloor
  • Superseal tape
  • Tape Measure
  • Standard utility knife

Eye protection, measuring tape, marker, chalk line

4″ (100mm) disposable paint brush to,

  • Patch tie-holes, rock pockets & honeycomb and surface imperfections,
  • Waterproof corners and seams,
  • Small waterproofing jobs.
Patching Tie-holes with SUPERSEAL Foundation Waterproof Sealant
Tie holes and rock pockets patched with SUPERSEAL Foundation Waterproof Sealant

 

ROLLER APPLICATION

Using a 1/2″ (15mm) paint roller, apply 2 thick coats of SUPERSEAL Foundation Waterproof Sealant to achieve a 40 mils cured Waterproof Coating.

SUPERSEAL Foundation Waterproof Sealant Roller Application
Rolling on SUPERSEAL Foundation Waterproof Sealant

 

INSTANT-SET SPRAY APPLICATION

With the SUPERSEAL Linebacker Pump, spray the Foundation Waterproof Sealant with the Instant-Set Accelerant in slow even passes ensuring complete coverage. The waterproof coating sets in one second.

SUPERSEAL Foundation Waterproof Sealant Spray application
SUPERSEAL Foundation Waterproof Sealant Instant-Set spray application

 

Buy Now

Rolls & Accessories:

For Higher Volume orders contact us directly at info@superseal.ca

0
    0
    Your Cart
    Your cart is emptyReturn to Shop