PRICING
- 3’6″ x 65’6″ (230 sq. ft.) SSDM / 1.07m x 20m $138.00
- 5’0″ x 65’6″ (325 sq. ft.) SSDM / 1.50m x 20m $195.00
- 6’0″ x 65’6″ (393 sq. ft.) SSDM / 1.83m x 20m $235.80
- 6’7″ x 65’6″ (431 sq. ft.) SSDM / 2.00m x 20m $271.53
- 7’4″ x 65’6″ (480 sq. ft.) SSDM / 2.24m x 20m $312.00
- 7’11” x 65’6″ (518 sq. ft.) SSDM / 2.40m x 20m $336.70
- 8’11” x 65’6″ (583 sq. ft.) SSDM / 2.70m x 20m $458.10
- 9’11” x 65’6″ (648 sq. ft.) SSDM / 3.00m x 20m $503.60
- 11’6″ x 65’6″ (754 sq. ft.) SSDM / 3.50m x 20m $580.02
- 13’2″ x 65’6″ (861 sq. ft.) SSDM / 4.00m x 20m $788.80
- DimpleGrip Molding (Bundle of 40 ft)$45.11
- Membrane Cap Molding (Bundle of 40 ft)$21.95
- SuperPlug (Bag of 50)$15.59
- Small Plug (Bag of 100)$11.02
SHIPPING
Standard Shipping: 3 – 7 Business Days
All shipping times are estimated and may not be 100% accurate. Shipping times may vary based on location and order size. Most orders are shipped within the next business day.
Fast Easy Installation, User Friendly
SUPERSEAL Dimpled Membrane is a long lasting black plastic membrane that is clean to work with. It is very flexible making it easy to bend around corners and can be cut with a utility knife. Unroll, Fasten, Backfill.
Bridges Cracks / Drainage Space
Setting and shifting of a block foundation can cause cracks or gaps in the foundation. SUPERSEAL can bridge over these and provides a 5/16 inch drainage space/airgap for the foundation wall. This allows any water that could enter the drainage space to fall by gravity into the exterior drain for removal.
Eliminates 100% of Hydrostatic Pressure
The main cause of leaks in a block wall foundation is hydrostatic pressure. SUPERSEAL removes all the hydrostatic/headwater pressure off the block wall as the membrane has a compressive strength of 5200 pounds per square foot. Putting all the pressure on the outside of the membrane.
Long-Lasting Basement Waterproofing Product
SUPERSEAL Dimple Membrane is chemical resistant and will not rot as it is made of high density polyethylene plastic. Some spray on or roll on coating can dissipate into the soil after only just a few years caused from the alkalines in the soils. SUPERSEAL is not affected by these environments and can outlast the life of the structure.
Rain or Shine, NO WAITING
SUPERSEAL starts working as soon as it is installed. There is no waiting as it does not need to cure or require a second coat. It can be done in any weather condition and backfilled the same day.
Environmentally Friendly
SUPERSEAL Dimpled Membrane does not emit any VOC’s. It doesn’t not affect the soil, creeks, streams or wildlife. Making it 100% environmentally friendly and safe.
Applications and Product Versatility
- Can be installed on any type of exterior foundation wall
- Can be installed on interior basement walls, including those with a french drain
- Can be installed under floor slabs
- Can be used in subfloor applications
Materials and tools may vary depending on your application for a Block Wall foundation.
SUPERSEAL DETAILED INSTRUCTIONS: Installation Instructions
EXTERIOR APPLICATION:
The keys to a good installation:
- Install to final grade height.
- Incorporate into the drain system at the footing.
- Install the membrane prior to installing perforated pipe and the drainstone.
- Ensure you have enough membrane, plugs, and molding strips to complete the area that you are protecting.
- We often recommend you order both types of molding. (DimpleGrip Molding & Membrane Cap) if your job has level and sloping areas)
- Follow the Installation instructions.
- Addition coating(s) or a self-adhesive membrane on the wall is not required but provides additional protection. Consult with your local building official or inspector, as they determine what they will accept. This can vary from city to city.
PREPARATION
- Ensure the site is safe and accessible.
- Make sure that you have all the tools and material necessary to complete the job.
- Determine the roll heights required and measure the length required.
- Determine the final grade height and snap chalk lines. The product should not be exposed to UV for long periods of time.
- Clean the footing and wall and repair any imperfections.
- Use a suitable mastic or tar for patching joints, gaps, protrusions, imperfections, etc. This can be found in the roofing or foundation section at your local lumber yard or Hardware store. (It is recognized as foundation mastic, roof patch, and plastic cement). The most cost effective is tar based and black in color. It is available in 1 and 5 gallon pails. It is also available in tubes designed to fit a caulking gun. SUPERSEAL is chemical resistant and compatible with all these types of products.
There are 3 steps to the installation – Do not try to do all three steps as you go. It is much easier and quicker to do it in 3 stages
- Hanging / Plugging / Molding
- HANGING THE MEMBRANE
It is best to have two people and to install the membrane. Once you have your wall prepped, start by holding the membrane at the chalk line with the dimples towards the wall and install a SuperPlug about 8-12 inches down from the top. Move down the wall approx. 8 -10 feet and install another SuperPlug. Continue this process until all the membrane is hanging on the wall. If you have extra material at the bottom. It is flexible enough to make a 90 degree bend where the wall meets the footing. The membrane can sit directly on top of the footing or extend out to the edge. If you are extending to the edge of the footing and come to an inside or outside corner, put a slice in the membrane at the bottom to allow the rest of the roll to wrap the corner without cutting the entire roll vertically. When hanging the membrane keep in mind that you don’t have to put all the plugs in now. You will do this on the next step.
OVERLAPS AND SEAMS
Vertical and horizontal overlaps are a minimum of 6 inches and a plug every 2’ vertically. It is good practice to run a bead of the mastic within the overlap but is not mandatory. Overlaps in sloping areas should be done by overlapping the higher piece over the lower piece. This will prevent migrating water to enter the seam. (just like a roof shingle).
ANGLES OR SLOPES
Angles can be done 2 ways:
1) by installing the membrane on the wall at the desired angle. If you do this, you can use the DimpleGrip Molding at the top, as you have not cut the top. The DimpleGrip fits the factory edges on the membrane.
2) by installing the membrane level on the wall and cutting the top to desired angle or slope. If you cut the top, you must use the Membrane Cap. The DimpleGrip won’t fit properly.
WINDOW WELLS
Windows are the # 1 cause of water penetration. Concrete cracks at the weakest point and that is almost always at the bottom of a window opening. If you have any windows that are lower than grade height and require a window well, cut and cap the membrane as close the bottom of the window as possible. Cut and cap the sides vertically so it will end up just inside the window well opening on each side. Vertical cuts should be made where there is a holding tab. (HINT: you can cap it later when you do the rest of the molding and capping)
After you have hung all the membrane, go back to where you started and start step 2 – plugging
PIPES AND PROTRUSIONS
Sometimes there is a pipe or a connection that protrudes through the wall and sticks out. Grout and/or seal around the pipe with mastic. Roll the membrane 12 inches past the center of the protrusion and cut the entire roll vertically. Then cut the membrane horizontally back to the center of the pipe and cut a hole the same size as the pipe. Fasten it in a couple spots to hold it in place while you cut the next piece. Put a bead of mastic where the next piece will overlap. Then cut the piece of membrane that you cut off earlier the same way in the opposite direction and overlap it 12 inches past the center of the pipe. Install a plug every 2 feet vertically. When backfilling, this is a good area to use drainstone.
After you have hung all the membrane, go back to where you started and start step 2 – plugging
- PLUGGING THE MEMBRANE
At the top is where you follow the specific pattern that repeats over and over. The basic pattern is; install a row of plugs 8 – 10 inches down from the top, every 16 inches horizontally. Then 8 inches down for that row of plugs install another row of plugs every 16 inches that are between the plugs above. This creates a “W” pattern . (See detailed instructions for more details)
- In the middle and the bottom, you put plugs every 6 -10 feet horizontally. Enough to keep the membrane tight against the wall. Try to get the bottom plugs as close to the footing as possible to prevent the membrane from moving around while the drain work and backfilling is being done.
- Plugs are installed every 2 feet vertically on all overlaps.
- Plugs are installed every 2 feet vertically and 4-6 inches in from inside and outside corners.
- After all the plugs are in, go back to where you started and start step 3 – Molding/Capping.
- MOLDING or CAPPING
Molding must be installed on all open edges using the Membrane Cap or DimpleGrip Molding. (HINT: We often recommend to order both DimpleGrip Molding & Membrane Cap if your job has both level and sloping areas)
DimpleGrip Molding is a piece of plastic 4 feet long and 3 ½ inches wide. It has reverse dimples on the back that interlock into the top 4 rows of dimples on the membrane itself. Giving a stronger hold which reduces the amount of plugs needed at the top. It has a soft lip on it that seals the top against the wall. It fits vertically and horizontally into the factory edges of the membrane. It costs a bit more but saves in time and labor. If you cut the membrane on an angle at the top, the dimples won’t fit properly, so you would use the Membrane Cap in that spot. You can use DimpleGrip for your entire job if your final grade is level. A good application is to use the DimpleGrip for horizontal edges and Membrane Cap for vertical edges, angles, and slopes.
Membrane Cap is a piece of plastic 4 feet long and only 1½ inches wide that seals all open edges. It is L shaped and smooth on the back. It can be installed horizontally, vertically, and on any angle. You can use the Membrane Cap throughout your entire job. However, you will use more SuperPlugs below the Membrane Cap than you would below the DimpleGrip. (see detailed instructions)
The DimpleGrip and the Membrane Cap are in a bundle with 10 pieces that are 4 feet long equaling 40 linear feet. Both are fastened every 6-8 inches butting each piece together as you go. Both can be cut with a standard utility knife. It is not necessary to overlap them.
Once the molding has been installed, it is good practice to walk around and patch any open spots. Feel free to put in addition plugs where desired, to keep it as flat as possible on the wall.
INSTALLING DRAIN SYSTEM
Install your drain system as per building code requirements. You must put a minimum of 6 inches of drain stone around the drainpipe, up on the footing, and up on the SUPERSEAL Membrane at the bottom. The bottom of the membrane should be incorporated in the drain system. This will allow any water that may enter the drainage space, to fall by gravity to the footing and migrate through the stone and into the pipe for removal.
FASTENING SYSTEMS
There are two molding systems to choose from. The DimpleGrip System and the Standard System
1) The DimpleGrip System requires DimpleGrip Molding and SuperPlugs. (see below)
2) The Standard System requires Membrane Cap and SuperPlugs. (see below)
DIMPLEGRIP FASTENING SYSTEM
(Premium system for ICF’s & Concrete Block)
Requires DimpleGrip Molding for horizontal and vertical edges. Super Plugs fastened 12-16″ OC and Membrane Cap for sloping areas. Small Plugs can be used to fasten corners and overlaps.
1 roll of membrane requires approximately:
- 2 bundles of DimpleGrip
- Membrane Cap for slopes and angles – 40 feet per bundle
- Super Plugs: 2 bags for 3’6″ to 7’11” per roll or 3 bags for 8’11” to 9’11” per roll
STANDARD FASTENING SYSTEM
(Most economical material cost system)
Requires Membrane Cap for all edges and Super Plug fastened 8″ OC. Small Plugs can be used to fasten corners and overlaps.
1 roll of membrane requires approximately:
- 2 bundles of Membrane Caps
- Super Plugs: 3 bags for 3’6″ to 7’11” per roll or 4 bags for 8’11” to 9’11” per roll
SuperPlugs
Each plug has 5 dimples that interlock into the membrane providing superior holding strength over a single plug. Recommended for all areas.
Membrane Cap
Smooth L shaped molding that caps the membrane – 40 feet per bundle.
DimpleGrip Molding (Optional)
Interlocks with the top 4 rows of the membrane along its entire length. Provides superior strength and uses less Super Plugs and labour.
Small Plugs (Optional)
Fits into individual dimple. Used mostly for contractors with a nail gun system.
TOOL REQUIRED
TAPCON – Block wall Foundations
Tapcon screws work the best in block foundations. Use 1¼ inch (1¼ inches x 3/16 inches hexagon head is best). This is a predrill system. This is more time consuming than a nail gun but works well if it you are doing a small job or it’s a onetime use. TAPCON https://www.tapcon.com/products/genuine-tapcon-screw-anchors
CONCRETE NAIL GUN – For some block walls
Any nailgun that is designed for concrete will work on walls that have been filled with concrete. These can be purchased or rented at your local tool rental center. Use 11/4” – 11/2” nails.
The following guns work very well with the system as they hold 40 nails and the installation is quick. The nose piece friction fits the SuperPlug and Small Plug perfectly without any fancy adapters.
HILTI GX 120 https://www.hilti.ca/direct-fastening/electrical-%26-mechanical-fastenings/r3697
HILTI G3 https://www.hilti.ca/direct-fastening/drywall-applications/3538128
Ramset Trakfast http://www.ramset.ca/product/47/trakfast-gas-powered-tool
Some nail guns are powder activated and have different strengths of shots.
CONCRETE NAILS – Hand nailing
It is possible to use standard concrete nails and a hammer. Concrete varies in hardness in different regions. This method is labor intensive and time consuming. This is usually only done when the concrete is freshly poured and is in the curing process. Test a spot first before continuing.
You can predrill a small pilot hole slightly smaller than the shank size of the nail and then hammer it in.
Other tools you may need:
Eye protection, Ear protection, gloves, hammer, Tool belt, tape measure, marker, chalk line, utility knife, ladder, caulking gun or putty knife
Specifications
PART # | IMPERIAL | METRIC | ||||
SM36107 | 3’6″ X 65’6″ | 230ft² | 29 lbs | 1.07m x 20m | 21.4m² | 13kg |
SM50150 | 5’0″ X 65’6″ | 325ft² | 40 lbs | 1.5m x 20m | 30m² | 18kg |
SM60183 | 6’0″ X 65’6″ | 393ft² | 49 lbs | 1.83m x 20m | 36.6m² | 22kg |
SM67200 | 6’7″ X 65’6″ | 431ft² | 53 lbs | 2.0m x 20m | 40m² | 24kg |
SM74224 | 7’4″ X 65’6″ | 480ft² | 59 lbs | 2.24m x 20m | 44.8m² | 27kg |
SM80240 | 7’11” X 65’6″ | 518ft² | 64 lbs | 2.4m x 20m | 48m² | 29kg |
SM81127 | 8’11” X 65’6″ | 583ft² | 72 lbs | 2.7m x 20m | 54m² | 33kg |
SM91130 | 9’11” X 65’6″ | 648ft² | 80 lbs | 3.0m x 20m | 60m² | 36kg |
SM11635 | 11’6″ X 65’6″ | 754ft² | 93 lbs | 3.5m x 20m | 70m² | 43kg |
SM13204 | 13’2″ X 65’6″ | 861ft² | 107 lbs | 4.0m x 20m | 80m² | 47kg |
Tested and Passes The Following |
|
Dimpled Sheet
|
High Density Polyethylene (HDPE)
|
Available Colors
|
Black (Standard), Brown (Special order)
|
Compressive Strength
|
5200 psf (250 kN/m² )
|
Dimple Height
|
5/16″ (8mm)
|
Fire Rating
|
B2 (DIN 4102)
|
Can I use SUPERSEAL Dimple Membrane on a concrete block foundation?
Yes, our product is well suited for the CMU walls and keeps mud and water away from the wall. CMU can absorb water into the hollow cavities. The SUPERSEAL membrane protects you from this.
Do I need to tar or coat the CMU prior to installing?
No, but ensure you install the SUPERSEAL to finish grade height to keep water off the wall. You may also want to consult with your local building official as they have specific requirements. Present with our evaluation report.
Should I install it over the footer?
The membrane must connect to the drain stone to allow the water moisture to enter the drainage system. Bring the drain stone to the membrane or the membrane to the stone and cover by 6 inches
Question
Ulises Gutierrez –
Select DimpleGrip Molding
(Is there any way can you tell me how many pieces and how long each piece is thank you
Watch Unwatch
SUPERSEAL –
Yes, there is 10 pieces per bundle and they are 4 feet long.
Question
Brian Doyle –
Is there an adhesive that can be used for seaming? Everything I’ve tried peels off when it dries.
Watch Unwatch
Ross Carmen –
you can use any foundation mastic, roof patch, plastic cement. If you use a self adhesive membrane, you need to use it with the primer.
Question
Chris Jankowiak –
What are my options for fasteners. I received my roll of membrane, cap and plugs. This will be going on a basement block wall. Tapcons? some sort of nails? I’m hoping for the quickest most effective method. Tapcons seem like too much work with drilling pilot holes.
Watch Unwatch
Ross Carmen –
1 1/4 x 3/16″Tapcons are the safest bet. Yes it is more labor intensive but most block walls are hollow and you run the risk of damaging them if you use a powerful concrete nailgun.
Chris Jankowiak –
Thanks will do!
Question
Brad Kemper –
Hello..I have a standard block foundation basement in my home built 2006 with drop ceiling in it and am wanting to apply this to back wall but not sure what size roll i need as the excavation hasnt started yet. Is there a way to tell the height of roll i would need for this application? Also is there a standard amount of hardware/plugs/moulding/cap for each size roll you buy? My basement is 55′ long on back wall and id say from floor of basenent to drop ceiling is approx 7ft.
Thanks
Brad
Watch Unwatch
Ross Carmen –
A test hole is best to determine the roll size. Its hard to determine the measurement because the distance varies in most homes from the top of the footing to top of slab. The rolls can easily be cut to height once you determine the exact measurement when you excavate. Ensure the roll is high enough. We offer a 8’11 roll. 2 bundles of dimplegrip molding and 2 bags of superplugs will work for you. You may have a few pieces of molding left over.
Question
Mark –
Question in regards to the DimpleGrip molding. I can’t find anything that says what type of fasteners to use, (what length, tapcons?) and placement of said fasteners on the molding. Thanks
Watch Unwatch
Ross Carmen –
1 1/4″ x 3/16 Tapcons will work the best. Concrete nails 1 1/4 or 1 1/2″
Question
Mike –
When will 7’11” Dimple Board be Available ?
Watch Unwatch
Ross Carmen –
Hi Mike ..I sent you an email…let me know what you would like to order and a ship to address and I can give you a delivered price….thanks
Question
David –
If this product is exposed above grade can it be protected from breaking down by coating it with exterior latex paint?
Watch Unwatch
Ross Carmen –
The membrane will expand and contract with temperature changes and paint will crack when this happens. You can use a elastomeric paint that will flex a bit and last awhile but not long term. The membrane is not supposed to be exposed to UV for long periods of time. It is best to cut the membrane off and cap or seal the top at grade height.
Question
Nag –
I am purchasing this for basement internal walls; Like to know if this material breaks down like you explained for external application on Aug 12 2021 comment as response to Bryan. As per below comments interior application also over time exposed to cold and warm conditions in various seasons; I will not be able to reach / inspect this material after framing , insulating & dry wall on top of this Dimple mat attached to concert wall and tucked into the parameter gap around by basement.
Watch Unwatch
Ross Carmen –
Direct sunlight and UV rays is what will break it down on the exterior. No concerns for your interior application.
Question
Josue Morales –
I am looking for high flow drainage membrane
Watch Unwatch
Ross Carmen –
How many square feet?
Question
Jake –
How do you install this product around steel wall bracing? Or is this supposed to go on before installing steel?
Watch Unwatch
Ross Carmen –
Hi Jake,
can you send a few pictures to info@superseal.ca ….thanks….
Question
bobby04040 –
I’m thinking of installing mat over part brink and part concrete basement walls the putting insulation board directly on the mat. Would this be advisable? Unfinished basement with no studs and french drain around perimeter.
Watch Unwatch
Ross Carmen –
The membrane is mechanically fastened to the wall. Rigid insulation fasteners can be used to fasten the board through the membrane and into the wall
Question
Bob –
do you have any idea when you will start shipping again?
Watch Unwatch
Ross Carmen –
Hi Bob,
We are hoping for the end of June….thanks….we will put inventory back on the shopping cart when we do.
Chris –
For a foundation block wall, what liquid applied product is recommended as a first layer behind your membrane system?
Ross Carmen –
Superseal is compatible with any waterproofing or damproof coating. There is alot of options and manufacturers. More expensive coatings perform better.
Question
Vanessa Williams Madinah –
Is there somewhere locally which can purchase this product in Illinois?
Watch Unwatch
SUPERSEAL –
The best way to purchase is ONLINE at https://www.superseal.ca/ or call 1 800 571 1877. Please allow 2-3 days for delivery. You can also special order through your local Menards store. Thank you
Glen –
Do you have photos of interior basement wall installs?
SUPERSEAL –
https://www.superseal.ca/foundation-membranes/interior-applications/ click to view the interior application on our website
https://www.alljerseyinc.com/jersey-shore-basement-mold-remediation-and-new-concrete-floor/
Thank you
Question
Marian Kasker –
What can my friend put over this (and how) to get a finished basement again? She had flooding from a hurricane & this is what the contractor put up and left her with. She has a sump pump. It looks horrible. She used to have a lovely finished apartment in the basement. Now no one knows how to finish the walls to put up paneling or whatever. She just has this “stuff” flapping loose on her walls.
Watch Unwatch
bhavani hamann –
Can you use dimpled water seal subfloor on outdoor wooden deck? To be used under deck vtiles?
Ross Carmen –
what type, brand, and thickness of tile?
SUPERSEAL –
Please send a few pictures…thank you
Question
Jimmy Williams –
What type of tool do you use to fasten it to the block? Is it pneumatic?
Watch Unwatch
SUPERSEAL –
For hollow block walls it is best to use 11/4″ x 3/16″ tapcon screws through the center hole on our superplug. If the blocks are filled you can use any type of concrete nail gun. It is best to test a spot first as a concrete nail gun could damage the block.
Beth Holder –
Have you been able to resume shipping to the US yet? If so, what would estimated shipping time to Kansas City, Missouri, USA be?
Ross Carmen –
Hi Beth,
Not at this time….we are hoping for the end of July….thanks
Question
Don Wantke –
Are you out of stock on every thing because of the corona virus or out of business? I would like to order some dimple board and accessories for my basement. Do you have any idea these will become available. Thank You
Watch Unwatch
Doug –
Have you resumed shipping to the US? Do you install the dimples toward the foundation wall or toward the back fill? If installed toward the backfill what would keep dirt out of channels? Can you backfill gravel directly toward the dimpleboard flat side?
Ross Carmen –
Hello Doug, yes we have started shipping some roll sizes….see our shopping cart. You will receive a separate email. Please provide a list of required product and a ship to address. We can give you a delivered price…thanks
Ross Carmen –
Thanks you for your interest. Due to the Corona Virus we have temporarily shut down all shipping. We will send you an email when we resume. We are hoping by the end of May. Sorry for any inconvenience.
john charles mikols –
how do you install the select membrane cap? i am putting it on a wood retaining wall. do i nail through the membrane cap using a small plug for each nail?
Ross Carmen –
You can use nails or screws directly through the cap. Small plugs and superplug are fastened with a nail or screw. Plugs are not used with the cap or dimplegrip molding
Gerry Mitchell –
I hope you are all doing ok, any idea on when you will start shipping?
Thanks and stay safe!
Ross Carmen –
Due to the recent spread of Covid 19….Superseal has temporarily stopped shipping in the USA.
We will respond by email when we resume sales.
We apologize for any inconvenience this may cause.
We were hoping to resume in June 2020…..unfortunately…..
We are now hoping for end of August… We will put a notice on our website and inventory in our shopping cart when we start up sales again. We will also send you an email update. Thanks for your interest in Superseal and patience during this time.
Please confirm receipt of this email
I can ship orders with 6 rolls or more….. they can be mixed sizes and accessories….and I need a tax ID #.
Question
Anthony Gregg –
If I used a Ramset Powder Actuated Gun with Ramset 1 1/2″ nails on the Super Plugs would that be okay given that the nails already have a plastic collar on them? So then there would be the collar and the Super Plug attached to the concrete wall? If not, how else would I do this using a Powder Actuated Gun? Thanks.
Watch Unwatch
Tim Williams –
We are building a wood retaining wall with 3″X12″ boards which vary in height between 3′ and 9′ height. Can we buy rolls of 3’6″ and overlap for the taller sections of the wall?
Ross Carmen –
Yes you can. I believe we spoke on the phone. Thank you for the order
Ross Carmen –
Anthony, yes you can…test a spot first as concrete varies in hardness and strength all across North America.
Question
Ernest –
I live in the Us and already have membrane and trim but no plugs to hang. Is there a alternate item to use since you are not currently shipping to US. I’m in middle of project and would like to get foundation finished up. Thx
Watch Unwatch
Ross Carmen –
Hi Ernest….give me a call when you have a chance….1 800 571 1877….thanks
Amber –
I have had trouble from the start with this product. Wish i never had it installed. Water gets trapped between the block and tge membrane and my basement walls are always damp! I hate it
Watch Unwatch
Ross Carmen –
Please give us a call when you have a chance…800 571 1877…..thanks
Question
BRYAN BRADLEY –
CAN TOP BE LEFT EXPOSED TO SUN
Watch Unwatch
Nag –
It is under “Interior Applications – French Drain” –SUPERSEAL Dimpled Membrane; Like to know if we face same issue as external with breaking over time. if installed in basement internal to cover concert wall.
Ross Carmen –
no concerns for your application
Ross Carmen –
The membrane should be covered within a few months of installation. After a year or two….the membrane exposed will start to break down. It should be terminated just below grade.